Back to BlogElectricians

US Electrician's Guide to Quoting Panel Upgrades

How American electricians quote electrical panel upgrades. Covers 200A service, code requirements, and permit processes.

4 February 20267 min read
electricianusauspanel upgradeservice

Panel upgrades are essential work for US electricians. Here's how to quote them.

Common Upgrade Scenarios

100A to 200A Upgrade

  • New 200A panel: $1,500-2,500
  • New meter base: $300-500
  • Utility coordination: Included
  • Permit and inspection: $200-400
  • Labour: $1,000-2,000
  • Total: $3,000-5,500

Panel Replacement (Same Amperage)

  • New panel: $800-1,500
  • Labour: $800-1,500
  • Permit: $150-300
  • Total: $1,750-3,300

Subpanel Addition

  • 100A subpanel: $500-1,000
  • Feeder cable: $5-10/foot
  • Labour: $500-1,000
  • Total: $1,200-2,500

Code Requirements

  • NEC 2020 or local adopted version
  • AFCI protection for bedrooms
  • GFCI protection for wet areas
  • Surge protection consideration

Permit Process

  • Application fee: $100-300
  • Inspection scheduling
  • Utility disconnect/reconnect coordination
  • Final inspection sign-off

Quote panel upgrades faster → [Try QuoteOS for Electricians](/trades/electricians)

Next step

See how QuoteOS turns job descriptions into quotes using your pricing.

Generate my first quote free

Ready to quote faster?

Turn job descriptions into professional quotes in minutes.

Generate my first quote free