Tiling quotes need accurate material calculations.
Underestimate tiles or adhesive, and you're making extra trips — or losing money.
Where tiling quotes go wrong
- **Tile wastage** — not accounting for cuts and breakage
- **Waterproofing** — often forgotten on bathroom quotes
- **Substrate prep** — levelling and repairs take time
- **Grout and adhesive** — underestimating quantities
- **Pattern complexity** — diagonal or herringbone takes longer
How to quote tiling jobs accurately
1. Calculate tile quantities properly
- Measure area (length × width)
- Add 10% for standard layouts
- Add 15-20% for diagonal or complex patterns
2. Include all materials
- Tiles (with wastage)
- Adhesive (check coverage rates)
- Grout
- Waterproofing membrane
- Silicone and trims
3. Account for prep work
- Substrate levelling
- Old tile removal
- Waterproofing application
4. Quote labour realistically
- Standard floor tiling: X m²/day
- Wall tiling: X m²/day
- Complex patterns: reduce by 30%
Professional tiling quotes that win jobs
Itemised quotes with clear scope:
- Build customer confidence
- Prevent disputes
- Protect your margins